References
İzmir City Hospital
İzmir City Hospital – construction site
TAI Composites Building, Ankara
Siphonic roof drainage installation
Kępno cold room
Hünfeld heat pump installation
References

Projects we have worked on

From city hospitals, stadiums and airport buildings to detached houses: a selection of projects where we carried out mechanical installation work on site.

117+Completed projects
8Hospital
1Stadium
3Airports and aviation
Vaillant aroTHERM Plus 12.2 kW – 1
Vaillant aroTHERM Plus 12.2 kW – 2
Vaillant aroTHERM Plus 12.2 kW – 3
Heat pump
Germany
Fulda, Germany · 2-storey apartment building

Vaillant aroTHERM Plus 12.2 kW

327 m²Area
12.2 kWCapacity
7 daysInstallation
System brandVaillant
  • Underfloor heating and potable water installation built from scratch.
  • The complete mechanical infrastructure was finished.
  • Commissioning, automation and technical handover completed.
Vaillant aroTHERM Split — New Building System Installation – 1
Vaillant aroTHERM Split — New Building System Installation – 2
Vaillant aroTHERM Split — New Building System Installation – 3
Heat pump
Germany
Hünfeld, Germany · 2-storey apartment building

Vaillant aroTHERM Split — New Building System Installation

120 m²Area
SplitHeat pump type
4 daysInstallation
System brandVaillant
  • Buffer tank and hot water cylinder installed.
  • Hot water, underfloor heating and hydraulic balancing completed.
  • Remote access enabled via the myVAILLANT app.
LAMBDA Eureka EU15L — Complete System Installation – 1
LAMBDA Eureka EU15L — Complete System Installation – 2
LAMBDA Eureka EU15L — Complete System Installation – 3
LAMBDA Eureka EU15L — Complete System Installation – 4
LAMBDA Eureka EU15L — Complete System Installation – 5
Heat pump
Slovakia
Poprad, Slovakia · 3-storey family home

LAMBDA Eureka EU15L — Complete System Installation

310 m²Area
16 kWCapacity
6 daysInstallation
  • Converted from a gas boiler to a LAMBDA Eureka EU15L heat pump.
  • Integrated with the mixed heating system.
  • Buffer tank and hot water immersion heater installed.
  • Commissioning and user briefing completed; a written workmanship warranty was provided.
STIEBEL ELTRON HPA-O 8 CS Plus — Complete System Installation – 1
STIEBEL ELTRON HPA-O 8 CS Plus — Complete System Installation – 2
STIEBEL ELTRON HPA-O 8 CS Plus — Complete System Installation – 3
STIEBEL ELTRON HPA-O 8 CS Plus — Complete System Installation – 4
Heat pump
Poland
Myślenice, Poland · Detached house

STIEBEL ELTRON HPA-O 8 CS Plus — Complete System Installation

148 m²Area
8.5 kWCapacity
4 daysInstallation
  • Converted from an oil boiler to a STIEBEL ELTRON HPA-O 8 CS Plus heat pump.
  • Fully integrated with the radiator heating system.
  • Hot water cylinder replaced and indoor unit installed.
  • Automation set up with the MyStiebel mobile app.
  • Commissioning and user briefing completed; a written workmanship warranty was provided.
Lambda Eureka EU08L — Plant Room Conversion – 1
Lambda Eureka EU08L — Plant Room Conversion – 2
Lambda Eureka EU08L — Plant Room Conversion – 3
Heat pump
Austria
Linz, Austria · Detached house

Lambda Eureka EU08L — Plant Room Conversion

180 m²Area
EU08LModel
8 daysInstallation
System brandLambda
  • The old boiler infrastructure and plant room were rebuilt.
  • Hot water, underfloor heating and hydraulic balancing completed.
  • Remote access enabled via Lambda Smart Control.
Daikin EWAT–B–C — Central System Modernisation – 1
Daikin EWAT–B–C — Central System Modernisation – 2
Central HVAC
Slovakia
Prešov, Slovakia · Business centre

Daikin EWAT–B–C — Central System Modernisation

1,240 m²Area
CentralHVAC system
ConversionBoiler to Daikin
System brandDaikin
  • The old boiler system was replaced with a high-efficiency Daikin solution.
  • Installation completed without interrupting business centre operations.
  • Capacity and energy use optimised.
Mezopotamia Kebab & Pizza — Cold Room and Freezer Room – 1
Mezopotamia Kebab & Pizza — Cold Room and Freezer Room – 2
Mezopotamia Kebab & Pizza — Cold Room and Freezer Room – 3
Cold room
Poland
Kępno, Poland · Restaurant

Mezopotamia Kebab & Pizza — Cold Room and Freezer Room

+2 °CCold room
−18 °CFreezer room
12 / 20 cmPanel thickness
  • All equipment, including panels and refrigeration units, was supplied from Türkiye.
  • The −18 °C room is designed for meat, chicken and frozen products; the +2 °C room for fresh vegetables, fruit and sauces.
  • Installed, tested and handed over.
Project details →
Geberit Bathroom Suite – 1
Bathroom
Poland
Wieliczka, Poland · Apartment

Geberit Bathroom Suite

1 dayInstallation
RenovationBathroom
System brandGeberit
  • Geberit ONE washbasin installed.
  • iCon vanity unit and bathroom suite fitted.
  • Plumbing connections completed and handed over.
İzmir City Hospital – 1
İzmir City Hospital – 2
İzmir City Hospital – 3
Siphonic roof drainage
Türkiye
İzmir, Türkiye · September 2019 – May 2020

İzmir City Hospital

8,300 mHDPE (PE 80) pipework
9 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
  • Main contractor: GAMA – Türkerler Joint Venture.
Konya City Hospital – 1
Konya City Hospital – 2
Konya City Hospital – 3
Siphonic roof drainage
Türkiye
Konya, Türkiye · November 2017 – June 2018

Konya City Hospital

6,400 mHDPE (PE 80) pipework
8 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
  • Main contractor: YDA İnşaat.
Manisa City Hospital – 1
Manisa City Hospital – 2
Manisa City Hospital – 3
Siphonic roof drainage
Türkiye
Manisa, Türkiye · October 2016 – February 2017

Manisa City Hospital

3,700 mHDPE (PE 80) pipework
4 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
  • Main contractor: YDA İnşaat.
Kütahya City Hospital – 1
Kütahya City Hospital – 2
Kütahya City Hospital – 3
Siphonic roof drainage
Türkiye
Kütahya, Türkiye · July – September 2021

Kütahya City Hospital

2,100 mHDPE (PE 80) pipework
3 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
  • Main contractor: Güriş.
Yoncalı Physiotherapy and Rehabilitation Centre – 1
Yoncalı Physiotherapy and Rehabilitation Centre – 2
Yoncalı Physiotherapy and Rehabilitation Centre – 3
Siphonic roof drainage
Türkiye
Yoncalı, Kütahya · May – June 2021

Yoncalı Physiotherapy and Rehabilitation Centre

1,300 mHDPE (PE 80) pipework
2 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
  • Main contractor: Güriş.
Kartal Dr. Lütfi Kırdar Training and Research Hospital
Siphonic roof drainage
Türkiye
Kartal, Istanbul

Kartal Dr. Lütfi Kırdar Training and Research Hospital

AnnexRoof drainage
SiphonicSystem
System brandWavin
  • Scope: Roof rainwater drainage using Wavin siphonic system technology.
Manisa Merkezefendi State Hospital – 1
Manisa Merkezefendi State Hospital – 2
Siphonic roof drainage
Türkiye
Manisa, Türkiye

Manisa Merkezefendi State Hospital

AnnexRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Kayseri Bünyan State Hospital – 1
Kayseri Bünyan State Hospital – 2
Siphonic roof drainage
Türkiye
Bünyan, Kayseri

Kayseri Bünyan State Hospital

CompleteRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Diyarbakır Stadium – 1
Diyarbakır Stadium – 2
Diyarbakır Stadium – 3
Siphonic roof drainage
Türkiye
Diyarbakır, Türkiye · May – July 2018

Diyarbakır Stadium

2,300 mHDPE (PE 80) pipework
2 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
TAI Composites Building – 1
TAI Composites Building – 2
TAI Composites Building – 3
Siphonic roof drainage
Türkiye
Ankara, Türkiye

TAI Composites Building

2,300 mHDPE pipework
95,000 m²Roof area
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Turkish Technic Istanbul Airport MRO Facilities – 1
Turkish Technic Istanbul Airport MRO Facilities – 2
Turkish Technic Istanbul Airport MRO Facilities – 3
Turkish Technic Istanbul Airport MRO Facilities – 4
Turkish Technic Istanbul Airport MRO Facilities – 5
Turkish Technic Istanbul Airport MRO Facilities – 6
Siphonic roof drainage
Türkiye
Istanbul, Türkiye · June – October 2020

Turkish Technic Istanbul Airport MRO Facilities

3,800 mHDPE (PE 80) pipework
5 monthsProject duration
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Dalaman Airport – 1
Dalaman Airport – 2
Dalaman Airport – 3
Siphonic roof drainage
Türkiye
Dalaman, Muğla

Dalaman Airport

5,800 mHDPE (PE 80) pipework
AnnexRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Vakıfbank Headquarters Building – 1
Vakıfbank Headquarters Building – 2
Vakıfbank Headquarters Building – 3
Siphonic roof drainage
Türkiye
Ataşehir, Istanbul

Vakıfbank Headquarters Building

2,350 mHDPE (PE 80) pipework
CompleteRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
BİM Warehouse – 1
BİM Warehouse – 2
BİM Warehouse – 3
Siphonic roof drainage
Türkiye
Döşemealtı, Antalya

BİM Warehouse

1,600 mHDPE (PE 80) pipework
WarehouseRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.
Gürallar LAV Glass Factory – 1
Gürallar LAV Glass Factory – 2
Gürallar LAV Glass Factory – 3
Gürallar LAV Glass Factory – 4
Siphonic roof drainage
Türkiye
Kütahya, Türkiye

Gürallar LAV Glass Factory

AnnexRoof drainage
SiphonicSystem
System brandGeberit
  • Scope: Roof rainwater drainage using Geberit siphonic system technology.

In addition, numerous installation, service and maintenance jobs in İzmir, Istanbul and Germany.

Let your project be our next reference

Tell us what you need; we will get back to you with a site survey, calculations and a written quotation.