Energy-Efficient
Electric Heat Pump Installation
With a free site survey and heat loss calculation, we design the right system for your building and carry out its installation and commissioning. We usually provide a quotation within 1–2 working days for a solution that can deliver significant savings compared with your current system.
Free site survey & heat loss calculation Manufacturer warranty Written workmanship warranty Installation to EU standards
38+
Completed installations
12years+
Years of experience
4
Countries of operation
When Is a Heat Pump the Right Choice?
If any of the following situations apply to you, a system assessment may be worthwhile.
Replacing an old boiler
For systems more than 10 years old, it can reduce energy costs considerably.
High energy bills
If your monthly costs have risen, a system assessment is advisable. A correctly installed system can deliver significant savings compared with your current one.
Building a new house
The most efficient integration takes place during construction. Adding it later is both more expensive and more complex.
Independence from gas
For those who want to be independent of gas price fluctuations, an electric heat pump is a secure alternative.
Government incentives
Active support programmes for heat pump installations are available in Poland, Germany, Austria and Slovakia. We provide up-to-date information at the quotation stage.
Low-temperature systems
If you have underfloor heating or low-temperature radiators, a heat pump runs at maximum efficiency.
Advantages
A correctly installed heat pump system delivers long-term benefits in both comfort and running costs.
Significant energy savings
Considerably reduces heating costs compared with a gas boiler. With a COP of 3–5, 1 kWh of electricity produces 3–5 kWh of heat.
Ideal with underfloor heating
Operates at low water temperatures (35–45 °C). Combined with underfloor heating, system efficiency reaches its maximum.
Heating and cooling
Air-source heat pumps provide cooling in summer, working as one system all year round.
Installation to EU standards
Installation, testing and commissioning are carried out and documented in accordance with the manufacturer’s instructions and EU standards.
Long service life & low maintenance
A correctly installed heat pump operates efficiently for many years with regular annual maintenance.
Brand-independent system recommendation
We select the right brand based on your budget and requirements. We are not tied to any particular brand.
6 Steps from Site Survey to Warranty
The same care and the same standard on every project.
1
Site survey request
Complete the form or message us on WhatsApp – we usually reply within 1–2 working days.
2
Capacity calculation
We inspect your building on site and calculate the heat loss and demand.
3
Quotation & planning
System design, brand recommendation and a detailed quotation are prepared.
4
Installation
Hydraulic, electrical and refrigerant connections are completed according to the agreed schedule. On average 4–8 days.
5
Commissioning
The system is optimised, parameters are set and the user is briefed.
6
Handover & warranty
Written workmanship warranty, the handover documents specified in the quotation and ongoing technical support.
Real Results from Real Projects
Selected heat pump installations we have recently completed.
VAILLANT Plus
FULDA · 2-STOREY APARTMENT BUILDING · 327 m²
Vaillant aroTHERM Plus 12.2 kW
- Complete System Installation
- Complete System Installation
NEW BUILDVaillant aroTHERM Plus 12.2 kW
7 days
Installation time
%27
Estimated energy saving*
12.2 kW
System capacity
Written
Workmanship warranty
Underfloor heating integration
Buffer tank + hot water cylinder installation
Commissioning and user briefing
Lambda Eureka EU08L
LINZ · DETACHED HOUSE · 180 m²
LAMBDA Eureka EU08L
- Complete Plant Room Conversion
- Complete Plant Room Conversion
CONVERSION FROM A PELLET BOILERLambda EU08L Air-Source Heat Pump
8 days
Installation time
%34
Estimated energy saving*
10 kW
System capacity
Written
Workmanship warranty
Old boiler infrastructure and plant room completely rebuilt
Hot water, underfloor heating and hydraulic balancing optimised
Remote access activated via Lambda Smart Control
VAILLANT Split
HÜNFELD · 2-STOREY APARTMENT BUILDING · 120 m²
aroTHERM Split
- Complete System Installation
- Complete System Installation
NEW BUILDaroTHERM Split
4 days
Installation time
%42
Estimated energy saving*
6 kW
System capacity
Written
Workmanship warranty
Underfloor heating integration
Buffer tank + hot water cylinder installation
Commissioning and user briefing
STIEBEL ELTRON
MYŚLENICE · DETACHED HOUSE · 148 m²
STIEBEL ELTRON HPA-O 8 CS Plus
- Complete System Installation
- Complete System Installation
CONVERSION FROM AN OIL BOILERSTIEBEL ELTRON
4 days
Installation time
%38
Estimated energy saving*
8.5 kW
System capacity
Written
Workmanship warranty
Full integration with the radiator system
Hot water cylinder replacement and indoor unit installation
Commissioning and user briefing
Automation via the MyStiebel mobile app
LAMBDA Wärmepumpen
POPRAD · 3-STOREY FAMILY APARTMENT BUILDING · 310 m²
LAMBDA Eureka EU15L
- Complete System Installation
- Complete System Installation
CONVERSION FROM A GAS BOILERLAMBDA Eureka EU15L
6 days
Installation time
%46
Estimated energy saving*
16 kW
System capacity
Written
Workmanship warranty
Integration with a hybrid heating system
Buffer tank + hot water immersion heater installation
Commissioning and user briefing
* The estimated energy saving is based on a calculation made at the design stage using building and system data; it is not a measured consumption result. The percentage shows the difference in calculated annual energy consumption (kWh) compared with the previous or an alternative heating system for the same building; it is not a running cost saving. The cost difference also depends on tariffs and fuel prices. Actual consumption varies with usage habits and weather conditions.
Your Questions Answered
We have compiled the questions our customers ask most often.
What does the price of a heat pump depend on?
The size of the house, the insulation, the existing system and the chosen brand determine the cost. A firm quotation is prepared after the free site survey.
How many days does installation take?
A standard detached house project is completed in 4–8 days. Removing the existing system and additional equipment can affect the timescale. The exact duration is confirmed after the site survey.
Is the old boiler removed?
It can be removed if required. In some cases, keeping it as a temporary backup is recommended. The infrastructure is assessed for every project.
Is underfloor heating required?
No. A heat pump also works with existing radiators, provided they are adequately sized. If they are not, they need to be replaced with suitable new radiators. The existing system is assessed during the site survey.
Is government support available in Poland?
Yes, various support programmes are available. The amount depends on income and the system. We provide up-to-date information at the quotation stage.
Is maintenance required, and how often?
Periodic maintenance once a year is usually recommended. The scope of maintenance depends on the model, operating conditions and the manufacturer’s instructions; the checks carried out and recommendations are recorded in the service report.
Get a Free System Assessment
for Your Project
Share your address and we will usually prepare the right system and an approximate investment plan within 1–2 working days.